Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.

Český abstrakt

Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.

Klíčová slova

hodnocení zakázek, životní cyklus staveb

Rok RIV

2012

Vydáno

26.04.2012

Místo

Brno, Česká republika

ISBN

978-80-86604-56-5

Kniha

17. mezinárodní symposium MOSTY/BRIDGES 2012

Strany od

43

Strany do

46

Strany počet

4

Dokumenty

BibTex


@inproceedings{BUT98296,
  author="Břetislav {Teplý} and Vladimír {Křístek}",
  title="Hodnocení zakázek a životní cyklus staveb",
  annote="Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.",
  booktitle="17. mezinárodní symposium MOSTY/BRIDGES 2012",
  chapter="98296",
  howpublished="electronic, physical medium",
  year="2012",
  month="april",
  pages="43--46",
  type="conference paper"
}