Detail publikace
Hodnocení zakázek a životní cyklus staveb
TEPLÝ, B. KŘÍSTEK, V.
Originální název
Hodnocení zakázek a životní cyklus staveb
Český název
Hodnocení zakázek a životní cyklus staveb
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
cs
Originální abstrakt
Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.
Český abstrakt
Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.
Klíčová slova
hodnocení zakázek, životní cyklus staveb
Rok RIV
2012
Vydáno
26.04.2012
Místo
Brno, Česká republika
ISBN
978-80-86604-56-5
Kniha
17. mezinárodní symposium MOSTY/BRIDGES 2012
Strany od
43
Strany do
46
Strany počet
4
Dokumenty
BibTex
@inproceedings{BUT98296,
author="Břetislav {Teplý} and Vladimír {Křístek}",
title="Hodnocení zakázek a životní cyklus staveb",
annote="Civil structures and infrastructures, such as buildings and bridges, are constructed and built for long service lives;many for over 50 or 100 yers. The whole-life cost associated with this life-cycle performance, therefore, is the pertinent cost that ought to be tha basic for determining the cost during the disign stage; this must include the maintenance and potential damage costs, besides the initial cost, over the of a system. This aspect must unavoidably be applied as the primary criterion for contract competitions.",
booktitle="17. mezinárodní symposium MOSTY/BRIDGES 2012",
chapter="98296",
howpublished="electronic, physical medium",
year="2012",
month="april",
pages="43--46",
type="conference paper"
}