DOSKOČIL, R.; DOUBRAVSKÝ, K.
Originální název
Risk Analysis of Stochastic PERT Graph
Anglický název
Druh
Článek recenzovaný mimo WoS a Scopus
Originální abstrakt
The paper deals with a time and probability analysis of stochastic graph PERT. The paper focuses on the comparison of two different approaches calculation of probability analysis and their influence on the calculation of the planning time of the project. Concretely the planning time of the project was calculated. A sample PERT network graph was examined, which comprised 18 nodes and 18 real activities and 6 fictions activities. For the purpose of the analysis, the basic characteristic times were calculated in accordance with traditional approaches related to the PERT method. For probability analysis was also calculated expected value, variance and standard deviance of the activities. For calculation of the planning time was used distribution function of standardized normal distribution. The PERT algorithm is realized by using spreadsheet in the MS Excel.
Anglický abstrakt
Klíčová slova
network graph, PERT method, node criticality, mean value, probability analysis
Klíčová slova v angličtině
Autoři
Rok RIV
2014
Vydáno
01.07.2013
Nakladatel
Akademické nakladatelství CERM
Místo
Brno
ISSN
1802-8527
Periodikum
Trendy ekonomiky a managementu
Svazek
7
Číslo
14
Stát
Česká republika
Strany od
35
Strany do
43
Strany počet
9
BibTex
@article{BUT100600, author="Radek {Doskočil} and Karel {Doubravský}", title="Risk Analysis of Stochastic PERT Graph", journal="Trendy ekonomiky a managementu", year="2013", volume="7", number="14", pages="35--43", issn="1802-8527" }