Course detail
Field Training III
FAST-GE22Acad. year: 2023/2024
Setting out tasks: setting out of spatial position of building,setting out of curve, survey of longitudinal profile and cross sections.
Determination of natural marked control points.
Measurement of distance of different methods.
Determination of height by precise levelling method.
Language of instruction
Czech
Number of ECTS credits
3
Mode of study
Not applicable.
Guarantor
Department
Institute of Geodesy (GED)
Entry knowledge
Handling with geodetic instruments, calculation of setting out elements
Rules for evaluation and completion of the course
Extent and forms are specified by guarantor’s regulation updated for every academic year.
Aims
Capability to carry out of simple setting out tasks, determination of natural marked control points. Use of GPS for determination of control.
Ability of setting out a simple objekt in terrain, to determinate of natural marked control points for aerial aerotriangulation. Use of GPS for determination of control.
Ability of setting out a simple objekt in terrain, to determinate of natural marked control points for aerial aerotriangulation. Use of GPS for determination of control.
Study aids
Not applicable.
Prerequisites and corequisites
Not applicable.
Basic literature
Abelovič, J. a kol.: Meranie v geodetických sieťach. Alfa Bratislava, 1990. (SK)
Michalčák, O. a kol.: Inžinierská geodézia I. Alfa Bratislava, 1985. (SK)
Richardus, P.: Project Surveying. A.A. Balkema Rotterdam, 1984. (EN)
Michalčák, O. a kol.: Inžinierská geodézia I. Alfa Bratislava, 1985. (SK)
Richardus, P.: Project Surveying. A.A. Balkema Rotterdam, 1984. (EN)
Recommended reading
Not applicable.
Classification of course in study plans
Type of course unit
Field training
80 hod., compulsory
Teacher / Lecturer
Syllabus
Checking measurement of network 1 day.
Setting out of spatial position of building 1 day.
Setting out of curve, survey of longitudinal profile and cross sections 1 day.
Determination of 4 natural marked control points 2 days.
Measurement of distance of different methods 1day.
Determination of height by precise levelling method 2 days.