Course detail
Control outflow from river basin
FAST-DSB027Acad. year: 2020/2021
Problems of river basin runoff control in real time, regulation circuit,
in-line, on-line and off-line methods, automated data collection and
transmission, data filtration, water management dispatchink, operative
control of supply function of water management system, operative
control of river basin runoff during the floods
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2. Regulation circuit, in-line, on-line and off-line methods.
3. Measuring items and automated data collection and transmission, data filtration.
4. Water management dispatchink.
5.–7. Operative control of supply function of water management system – application.
8.–13. Operative control of river basin runoff during the floods – application.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
- Programme DPC-V Doctoral 2 year of study, winter semester, compulsory-optional
- Programme DPA-V Doctoral 2 year of study, winter semester, compulsory-optional
- Programme DPC-V Doctoral 2 year of study, winter semester, compulsory-optional
- Programme DKA-V Doctoral 2 year of study, winter semester, compulsory-optional
Type of course unit
Lecture
Teacher / Lecturer
Syllabus