Master's Thesis

Vysoké Mýto - connection to motorway R35, phase of construction

Final Thesis 497.28 kB Appendix 55.44 MB

Author of thesis: Ing. Martin Novák

Acad. year: 2013/2014

Supervisor: doc. Ing. Petr Holcner, Ph.D.

Reviewer: Ing. Stanislav Netolický

Abstract:

The thesis deals with the stages of development of Vysoke Myto road network with an emphasis to design an optional diversion of the traffic from the town itself even before the planned R35 is finished. The designed solution, including road connections to the present and future network, is to be functional, utilizable and economically desireable in all the stages of development.

Keywords:

Vysoké Mýto, road line, directional solution, vertical alignment, cross disposition, local roads, roads, speedway

Date of defence

04.02.2014

Result of the defence

Defended (thesis was successfully defended)

znamkaCznamka

Grading

C

Language of thesis

Czech

Faculty

Department

Institute of Road Structures

Study programme

Civil Engineering (N-P-C-SI)

Field of study

Constructions and Traffic Structures (K)

Supervisor’s report
doc. Ing. Petr Holcner, Ph.D.

File inserted by supervisor Size
17810.pdf 370,69 kB

Reviewer’s report
Ing. Stanislav Netolický

File inserted by the reviewer Size
17696.pdf 44,70 kB

Responsibility: Mgr. et Mgr. Hana Odstrčilová