Přístupnostní navigace
E-application
Search Search Close
Master's Thesis
Author of thesis: Ing. Zuzana Paszandová
Acad. year: 2012/2013
Supervisor: doc. Ing. Jan Pavlíček, CSc.
Reviewer: Ing. Josef Veselý
The thesis deals with design of the tram power collecting route and the tram track of the route no. 3 in reconstruction area recently called “Zbrojovka Brno”. Connection to the present infrastructure is also considered. Housing, resting, administration sectors and tram stops are designed for easy availability in the new area. Because the railroad bounds the area on the East and will be extended in the future, joining the tram transport with integrated transport system in Židenice is possible. Design includes the new bridge across Svitava river and connection with surrounding areas. If we divide individual car transport (IAD) from the tram route, the trolley car transportation is designed in place IAD.
Local collecting route, transportation, tram track, car transport, trolley car transport, railroad corridor, transfer junction IDS JMK, station, sidewalk, pedestrian crossing, roadway, intersection, traffic signs
Date of defence
29.01.2013
Result of the defence
Defended (thesis was successfully defended)
Grading
C
Language of thesis
Czech
Faculty
Fakulta stavební
Department
Institute of Road Structures
Study programme
Civil Engineering (N-P-C-SI)
Field of study
Constructions and Traffic Structures (K)
Supervisor’s reportdoc. Ing. Jan Pavlíček, CSc.
Reviewer’s reportIng. Josef Veselý
Responsibility: Mgr. et Mgr. Hana Odstrčilová