Master's Thesis

The second phase shifting I/9 Dubice - Dolni Libchava

Final Thesis 498.86 kB Appendix 13.89 MB

Author of thesis: Ing. Miroslav Belda

Acad. year: 2012/2013

Supervisor: Ing. Michal Kosňovský, Ph.D.

Reviewer: Ing. Daniel Jíra

Abstract:

Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section.

Keywords:

Crossroads, roundabout, annulus, central island, circulatory roadway, directional island, pavement construction, sidewalk, vertical alignment, cross section, road by-pass

Date of defence

30.01.2013

Result of the defence

Defended (thesis was successfully defended)

znamkaAznamka

Grading

A

Language of thesis

Czech

Faculty

Department

Institute of Road Structures

Study programme

Civil Engineering (N-P-C-SI)

Field of study

Constructions and Traffic Structures (K)

Supervisor’s report
Ing. Michal Kosňovský, Ph.D.

File inserted by supervisor Size
10062.pdf 244,17 kB

Reviewer’s report
Ing. Daniel Jíra

File inserted by the reviewer Size
10063.pdf 276,69 kB

Responsibility: Mgr. et Mgr. Hana Odstrčilová