Přístupnostní navigace
E-application
Search Search Close
Master's Thesis
Author of thesis: Ing. Jan Křičenský
Acad. year: 2025/2026
Supervisor: doc. Ing. Radka Kantová, Ph.D.
Reviewer: Ing. et Ing. Aleš Průcha
The aim of this thesis is to prepare the implementation of the second construction phase of a new residential zone in Vrchlabí. Specifically, the thesis focuses on selected parts of the construction technology project, primarily for the structural framework of residential buildings. The work addresses the execution of all cast-in-place concrete structures, including deep foundations using bored piles. For these construction processes, technological procedures were prepared, along with the design and verification of supply routes and inspection plans to ensure quality. For the entire construction phase, a proposal of the machinery setup and a plan to ensure occupational health and safety requirements were also developed. The project is further addressed from a time and cost perspective, specifically in the form of an object-based time and financial plan, a construction schedule for the structural framework of the main building, and a bill of quantities also for the structural framework of the main building. The thesis also includes a site layout plan, including the placement and verification of the main machinery required for the construction. Finally, the calculation of the stripping time for cast-in-place concrete structures is presented, along with an alternative proposal for the concrete strength class, including its impact on stripping time and costs.
Vertical cast-in-place concrete structures, horizontal cast-in-place concrete structures, residential building complex, tower crane, masonry structures, prefabricated reinforced concrete staircase, occupational health and safety (OHS), construction site facilities, construction machinery, technological procedure, time schedule, inspection and test plan, budget
Date of defence
04.02.2026
Result of the defence
Defended (thesis was successfully defended)
Grading
B
Process of defence
Student seznámi členy komise s obsahem diplomové práce po technické a obsahové stránce. Dále proběhla rozprava při otázkách oponenta. Členové komise se dotazovali průběžně: doc. Motyčka rozprava o soustavě věžových jeřábů, student částečně odpověděl. dr. Mohapl rozprava o betonových směsích, student částečně odpověděl. dr. Vlčková rozprava k otázkám oponenta a hlukovém zatížení kokolí od stavby, student odpověděl. ing. Doubek rozprava o vrtné soupravě a pilotách, student částečně odpověděl.
Language of thesis
Czech
Faculty
Fakulta stavební
Department
Institute of Technology, Mechanisation and Construction Management
Study programme
Civil Engineering – Construction Project Execution (NPC-SIR)
Composition of Committee
doc. Ing. Vít Motyčka, CSc. (místopředseda) Ing. Jitka Laura Vlčková, Ph.D. (člen) Ing. Rostislav Doubek (člen) doc. Ing. Rostislav Šulc, PhD. (předseda) Ing. Martin Mohapl, Ph.D. (člen) Ing. Zuzana Fišarová, Ph.D. (člen)
Supervisor’s reportdoc. Ing. Radka Kantová, Ph.D.
Grade proposed by supervisor: A
Reviewer’s reportIng. et Ing. Aleš Průcha
Grade proposed by reviewer: A
Responsibility: Mgr. et Mgr. Hana Odstrčilová