Master's Thesis

Bicycle trail via VD Nové Mlýny along the I / 52 road

Final Thesis 1.67 MB Appendix 33.78 MB

Author of thesis: Ing. Filip Kuric

Acad. year: 2018/2019

Supervisor: Ing. Michal Kosňovský, Ph.D.

Reviewer: Ing. Jakub Nykodym

Abstract:

The diploma thesis deals with the transfer of cyclists through the dam of Nové Mlýny. The design runs alongside the dam, outside the existing I/52 road, as a preparation for the D52 motorway.
The thesis solves the design of longitudinal alignment and vertical alignment of the cycle path along the I/52 road, connection of the cycle path to the adjacent network of cycling routes and variants of crossing cycle path 5174 with route I/52 due to an increase of safety.

Keywords:

cycle path, tertiary road, bicyclist, longitudinal alignment, vertical alignment, dam, bridge, natural reserve

Date of defence

31.01.2019

Result of the defence

Defended (thesis was successfully defended)

znamkaAznamka

Grading

A

Process of defence

Student Kuric Filip seznámil komisi s obsahem své diplomové práce. Na otázky a připomínky plynoucí z posudků vedoucího a oponenta a komise při odborné rozpravě nad diplomovou prací ~Cyklostezka přes VD Nové Mlýny podél silnice I/52~ reagoval výborně.

Language of thesis

Czech

Faculty

Department

Institute of Road Structures

Study programme

Civil Engineering (N-P-C-SI)

Field of study

Constructions and Traffic Structures (K)

Composition of Committee

Doc. Ing. Josef Kocourek, Ph.D. - předseda,
doc. Dr. Ing. Michal Varaus - místopředseda,
Ing. Adam Puda - tajemník,
Ing. Michal Kosňovský, Ph.D. - člen,
Ing. Martin Všetečka, Ph.D. - člen,
Ing. Luděk Mališ - člen,
Ing. Radovan Hrnčíř - člen,
Ing. Veronika Valentová, Ph.D. - člen

Supervisor’s report
Ing. Michal Kosňovský, Ph.D.

File inserted by supervisor Size
47276.pdf 54,26 kB

Reviewer’s report
Ing. Jakub Nykodym

File inserted by the reviewer Size
47277.pdf 292,63 kB

Responsibility: Mgr. et Mgr. Hana Odstrčilová