This thesis discusses the reconstruction of the turbogenerator TG5 of the Elektrárny Opatovice and introduces options of technical solutions for power central of combined heat and electricity production. First section describes the differences between back-pressure and condensing turbines. Next section briefly introduces the company Elektrárny Opatovice a.s. with the description of the current back-pressure turbine TG5, which is near end of it life cycle and is to be reconstructed in following years. Based on the technical-economic analysis of the operation of the current TG5, possible benefits of new technical solutions are proposed.
Heating industry, Elektrárny Opatovice a.s., balancing scheme, back-pressure steam turbine, economy of operation
Date of defence
14.06.2018
Result of the defence
Defended (thesis was successfully defended)
Grading
B
Process of defence
Zodpovězeny dotazy oponenta DP. V rozpravě byly položeny tyto otázky: Jak se zahrnovaly ucpávky. Kde byly měřeny veličiny DM. Jak jste převáděl hodnoty, korekce. Jak se měřil hmotnostní průtok. Jak probíhá měření clonou. Systém ucpávkové páry.
Language of thesis
Czech
Faculty
Fakulta strojního inženýrství
Department
Energy Institute
Study programme
Mechanical Engineering (M2I-P)
Field of study
Power Engineering (M-ENI)
Composition of Committee
doc. Ing. Jan Fiedler, Dr. (předseda) Ing. Petr Kracík, Ph.D. (místopředseda) Ing. Stanislav Kubiš, CSc. (člen) Ing. Radovan Kundera (člen) Ing. Tomáš Flimel (člen) Ing. Pavel Čáslava (člen)
Supervisor’s reportIng. Petr Kracík, Ph.D.
Grade proposed by supervisor: A
Reviewer’s reportIng. Pavel Milčák, Ph.D.
Grade proposed by reviewer: B
Responsibility: Mgr. et Mgr. Hana Odstrčilová