Course detail
Selected sections of building technology processes - GI
FAST-CW55Acad. year: 2009/2010
The course covers study of selected construction processes related with realization of underground constructions, building and engineering constructions. Technology, space and time structure, requirements on the site preparation, principles of execution of construction process as well as quality requirements are explained.
The substantial part of the course is aimed at execution of underground structures where technologies of special foundation of constructions for execution of excavated underground structures are given, together with overview of classical and modern tunnelling systems and arrangements, machines and equipment for underground constructions.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2.Technology of special foundation of constructions related with excavated underground constructions.
3.Casing structures (Stent walls, pile and underground walls), injecting and anchoring of rock surrounding.
4.Nomenclature of building constructions. Tunnelling systems and assemblies.
5.Classic assemblies. Drilling and blasting. Ring method.
6.New Austrian tunnelling method (NATM). Peripheral notch method. Micro-tunnelling.
7.Machines and equipment for underground constructions (cut, excavated, combined, micro-tunnelled).
8.Earthworks – filling structures (dam material, construction procedures, compacting means). Underground walls (application, construction procedure).
9.Additional pressure grouting and reinforcement injecting. Trenchless technologies – cutting of tunnels (drifts), shielding, pushing, micro-tunnelling, controlled drilling.
10.Principles of making the walling of bricks, formed bricks and stone. Module, technology and quality requirements. Quality control.
11.Manufacture of steel and timber structures, welding of steel structures, connecting materials for steel and timber structures, transportation to the site.
12.Main ways of the assembly of steel and timber structures.
13.Execution of road bearing structure and pavement cover.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Klepsatel,F.,Kusý,P.,Mařík,L.: Městské podzemní stavby. JAGA Bratislava, 2005.
Klepsatel,F.,Kusý,P.,Mařík,L.: Výstavba tunelů ve skalních horninách. JAGA Bratislava, 2003.
Kudrna,J.: Technologie pozemních komunikací. VUT v Brně, FAST, 2007.
Lízal,P. a kol.: Technologie stavebních procesů pozemních staveb - úvod do technologie. Cerm, s.r.o. Brno, 2003.
Recommended reading
Kolymbas,D.: Geotechnik-Tunnelbau und Tunnelmechanik. Springer, 1998.
Classification of course in study plans