Project Sewerages and WWTP

FAST-BPA011Acad. year: 2026/2027

The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.

Language of instruction

Czech

Number of ECTS credits

4

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Entry knowledge

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme BPC-SI Bachelor's

    specialization V , 4 year of study, summer semester, compulsory

Type of course unit

 

Project

26 hours, compulsory

Teacher / Lecturer

Syllabus

1. Project assignment, provision of supporting documents
2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet
3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report
4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report
5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report
6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report
7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater
8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules
9. Processing of JES - Unified Environmental Statement
10. Preparation of the thesis presentation, completion of the project
11. Credit, defense of the project