Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BPA011Acad. year: 2026/2027
The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Entry knowledge
Rules for evaluation and completion of the course
Aims
Study aids
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
specialization V , 4 year of study, summer semester, compulsory
Project
Teacher / Lecturer
Syllabus
1. Project assignment, provision of supporting documents2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules9. Processing of JES - Unified Environmental Statement10. Preparation of the thesis presentation, completion of the project11. Credit, defense of the project