Course detail

Project Sewerages and WWTP

FAST-BPA011Acad. year: 2025/2026

The subject expands and practices theoretical knowledge and practical design skills that are acquired in the subjects Drainage and Wastewater Treatment. The project deals with drainage for a family house with a sewer connection and a domestic wastewater treatment plant in a real area of ​​interest. The project is prepared in the form of project documentation according to Decree No. 131/2024 Coll. on construction documentation.

Language of instruction

Czech

Number of ECTS credits

4

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Entry knowledge

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Elearning

Classification of course in study plans

  • Programme BPC-SI Bachelor's

    specialization V , 4 year of study, summer semester, compulsory

Type of course unit

 

Project

26 hours, compulsory

Teacher / Lecturer

Syllabus

1. Project assignment, provision of supporting documents
2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet
3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report
4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report
5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report
6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report
7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater
8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules
9. Processing of JES - Unified Environmental Statement
10. Preparation of the thesis presentation, completion of the project
11. Credit, defense of the project

Elearning