Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BPA011Acad. year: 2025/2026
The subject expands and practices theoretical knowledge and practical design skills that are acquired in the subjects Drainage and Wastewater Treatment. The project deals with drainage for a family house with a sewer connection and a domestic wastewater treatment plant in a real area of interest. The project is prepared in the form of project documentation according to Decree No. 131/2024 Coll. on construction documentation.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Entry knowledge
Rules for evaluation and completion of the course
Aims
Study aids
Prerequisites and corequisites
Basic literature
Recommended reading
Elearning
Classification of course in study plans
specialization V , 4 year of study, summer semester, compulsory
Project
Teacher / Lecturer
Syllabus
1. Project assignment, provision of supporting documents2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules9. Processing of JES - Unified Environmental Statement10. Preparation of the thesis presentation, completion of the project11. Credit, defense of the project