Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-0S7Acad. year: 2021/2022
 Introduction, definitions, history of the pond construction in CR Categorization and functions, rsurvey, selection of locality for small water reservoir Water management of small water reservoirs, water losses, physical, chemical and biological processes Modelling of self-cleansing processes Pond dams, outlets, extractions, safety spillways, pond bottom, littoral zone, reservoir surrounding Fish breeding ponds, water supply, industrial and irrigation reservoirs Erosion control reservoirs, rainfall water reservoirs, etc. Manipulation and operation code, silt removal, reservoir restoration
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Lecture
Teacher / Lecturer