Ecology and occupational safety in the construction industry, global environmental problems and sustainable development, general knowledge of environmental care, environmental management and related regulations, production of environmental plans for the protection of the environment in connection with the construction technology model of a structure , outdoor acoustics, operation of “Hluk+” software, health and safety protection at construction sites, prevention of risks, safety coordinator, OHS plan.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2. Production of environmental plans for the protection of the environment in connection with the construction technology model of a construction process (continuity and specific solutions for individual selected construction sub-processes), consideration of ecological regulations during the execution of an assigned construction.
3. Health protection against noise and vibrations. Valid legislation.
4. Measurement of external noise from machines, methods of noise evaluation in protected areas outside executed structures, lowering the level of construction site noise.
5. Terminology concerning the rights and duties of participants in the construction process. The OHS management system in the Czech Republic; EU framework directives.
6. Risk prevention and management, safety risks, health risks.
7. The safety coordinator and his/her role in the construction process.
8. The OHS plan in connection with the construction technology model of a structure. Requirements for the production of an OHS plan and its contents; consideration of safety regulations during the execution of an assigned construction process.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
2. Production of environmental plans for the protection of the environment in connection with the construction technology model of a construction process (continuity and specific solutions for individual selected construction sub-processes), consideration of ecological regulations during the execution of an assigned construction.
3. Health protection against noise and vibrations. Valid legislation.
4. Measurement of external noise from machines, methods of noise evaluation in protected areas outside executed structures, lowering the level of construction site noise.
5. Terminology concerning the rights and duties of participants in the construction process. The OHS management system in the Czech Republic; EU framework directives.
6. Risk prevention and management, safety risks, health risks.
7. The safety coordinator and his/her role in the construction process.
8. The OHS plan in connection with the construction technology model of a structure. Requirements for the production of an OHS plan and its contents; consideration of safety regulations during the execution of an assigned construction process.
Exercise
Teacher / Lecturer
Syllabus
2. Assignment of the production of part of an environmental plan for the protection of the environment in connection with the construction technology model of a structure.
3. Production of part of an environmental plan for the protection of the environment in connection with the construction technology model of a structure – consultation regarding individual assignments.
4. Acquaintance with computer models for noise evaluation, production of an assignment from the area of construction site noise abatement.
5. Processing of safety risks for a stage of the construction process – assignment.
6. Processing of safety risks for a stage of the construction process – consultations.
7. Consultations regarding the individual assignments in the areas of ecology and OHS.
8. Presentation and defence of individual assignments.