Course detail
Information system in construction technology
FAST-DW62Acad. year: 2015/2016
Software support of construction planning and production control, its integration into the information system of construction company. Planning and progress control of construction works at the level of contemporary information technology and corresponding to the actual development of construction production. Construction activity organization depending on the control structure of company. Elaboration of tender documentation, construction-technology plans, effectiveness of performed work, controlling. Control systems: QMS – Quality Management System, EMS – Environmental Management System, HSMS – Health and Safety Management Scheme. The use of information system by managerial staff within a firm with certificated management system.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
4.-6. Creation of construction schedule (MS PROJECT) in dependence on adjusting of user’s fields. Technological model of construction. Calendars of project, activities and resources. Surveillance and progress control of construction. Master plan. Activity up-dating. Schedule up-dating.
7.-9. Integration of quality control requirements with environmental management and safety of work control demands. Elaboration of quality control plan. Plan of requirements of EMS on construction site. Requirements for work safety. Object linking of documents (MS Office) to particular activities.
10.-12. Building production control (RSV) in accordance with budget as a result of costing program. Connection between costing software and Microsoft Office Project. Job logging. Controllling.
13. Summary information including the examples of planning and documents of a company with certified systems in the field of QMS, EMS and HSMS. Quality control plans of particular activities. Register of EMS aspects. Safety enterprise.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
HRAZDIL, V.: M05 Modelování výrobních procesů v IS stavebního podniku. Studijní opora Modelování výrobních procesů, FAST VUT v Brně 2007
Recommended reading
BARRIE, D., S.: Professional construction management. New York, McGraw-Hill 2002
Classification of course in study plans
- Programme D-K-C-SI (N) Doctoral
branch PST , 2 year of study, winter semester, elective
- Programme D-K-E-CE (N) Doctoral
branch PST , 2 year of study, winter semester, elective
- Programme D-P-C-SI (N) Doctoral
branch PST , 2 year of study, winter semester, elective
- Programme D-P-E-CE (N) Doctoral
branch PST , 2 year of study, winter semester, elective