Course detail
Rehabilitation of Water and Sewerage Networks
FAST-BP56Acad. year: 2012/2013
The course deals with conception problems of solving rehabilitation of water and sewer systems (water mains, sewerage). Planning methods, survey methods of current conditions. Overview of trenchless technology methods use for rehabilitation of water mains and sewerage systems focused on local repairs, general repairs of networks and new line and repairs of objects.
The main themes of subjects are: overview of related standard specifications of legislation and standardization projects, systems of water and sewerage networks, material and diameter of water and sewerage networks, maintenance, information about current status of water and sewerage networks, classification of failures and appreciation, service life, methodology of failure removal, initial phase of works before rehabilitation, service availability of system, exploratory survey, conceptual solution of rehabilitation, rehabilitation methods, methods used and constructions build in the Czech Republic.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Student will manage to design of rehabilitation plan, technical design of rehabilitation of water and sewer networks and design of nodig rehabilitation technologies.
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2. Conceptual solving of rehabilitation of water supply network and sewerage network, maintenance and cleaning
3. Special substance and pipe materials
4. Survey and failures on drains and sewers, classification of failures
5. Advance workings before rehabilitation, preservation of serviceability of system, selection of methods
6. Repair of drains and sewers
7. Renovation of drains and sewers
8. Replacement of drains and sewers
9. Rehabilitation of shafts and objects on sewerage networks
10. Infiltration and ex-filtration
11. Survey and failures on water-supply networks
12. Rehabilitation of water supply networks
13. Safeness and protection, assessment of availability and selection of methods
14. Rehabilitation in CZ and abroad
Work placements
Aims
- Design of rehabilitation methods
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
RACLAVSKÝ, Jaroslav a kol.: Rekonstrukce vodohospodářských sítí (stud. opora). Brno: VUT v Brně, FAST, 2006. (CS)
Recommended reading
ESTERKOVÁ, M. a kol.: Bezvýkopová obnova podzemních vedení.. Praha: GAS, 1998. (CS)
KLEPSATEL, F., MARCINČÁK, M., RACLAVSKÝ, J.: Bezvýkopová výstavba podzemních vedení. Praha: GAS, 1996. (CS)
Roscher, H. u.a.: Sanierung städtischer Wasserversorgungsnetze. Verlag Bauwesen, Berlin, ISBN 3-345-00717-7, 2000. (DE)
Stein, D.: Rehabilitation and Maintenance of Drains and Sewers. Ernst & Sohn, Berlin, ISBN 3-433-01316-0, 2001. (EN)
ŠPALEK, Petr a RACLAVSKÝ, Jaroslav: Sanace stok a kanalizačních přípojek - Technická směrnice. Praha: Hydroprojekt a.s., 2000. (CS)
Classification of course in study plans
- Programme B-P-C-ST Bachelor's
branch V , 3 year of study, summer semester, elective
- Programme B-P-E-SI Bachelor's
branch V , 4 year of study, summer semester, compulsory
- Programme B-P-C-SI Bachelor's
branch V , 4 year of study, summer semester, elective
- Programme B-K-C-SI Bachelor's
branch V , 4 year of study, summer semester, compulsory
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
2. Maintenance and cleaning of sewer networks, failure of sewerage networks and sewage connections.
3. Inspection, classification and assessment of the condition of sewer system.
4. Repair of sewer systems and sewer connections.
5. Renovation of sewer systems and sewer connections.
6. Replacement and construction of sewer systems and sewer connections.
7. Technical condition of water networks.
8. Repair of water supply networks.
9. Renovation of water supply networks.
10. Replacement and construction of water networks.
11. Plans for rehabilitation of water and sewer networks.
Exercise
Teacher / Lecturer
Syllabus
2. The technique used in the exploration of sewer networks, technology presentations, discussions.
3. Evaluation of camera survey by CCTV video recording.
4. Project - Rehabilitation of selected parts of the sewer network 1 - Hydraulic calculation.
5. Project - Rehabilitation of selected parts of the sewer system second - Design of measures.
6. Fluid - viscosity measurement, calculation of jacking forces when laying pipes by pipe jacking, calculation of the pulling forces during laying of pipes by HDD.
7. Project - Rehabilitation of selected parts of the water supply network 1 - Hydraulic calculation.
8. Project - Rehabilitation of selected parts of the water supply network 2 - Design of measures.
9. Rehabilitation plan for water and sewerage networks - study.
10. Practical examples of technologies - discussion.
11. Credit.