Course detail
Railway Stations and Junctions II
FAST-CN54Acad. year: 2012/2013
Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and trough passenger stations.
Storage stations, technology, sets of tracks arrangement. Equipment of storage stations
Shunting yards, functions, position in railway network. Development of sorting technology. Set of reception sidings. Hump, technical equipment, sets of tracks design, longitudinal section of hump track, dynamic estimation. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
Depots, running shed. Technology, arrangement of trackage.
Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks
Railway junctions, passenger and goods traffic
New methods for railway vehicles monitoring, satellite monitoring system in railway traffic
Track recording cars for electric catenary system and clearances. Signaling systems and automatic train control system
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Acquisition of the credit is conditional on attendance and delivery of project of shunting yard.
Course curriculum
2. Storage stations, technology, sets of tracks arrangement. Equipment of storage stations
3. Shunting yards, functions, position in railway network. Development of sorting technology. Set of reception sidings.
4. Hump, technical equipment, sets of tracks design, longitudinal section of hump track, dynamic estimation.
5. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
6. Depots, running shed. Technology, arrangement of trackage. Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks.
7. Railway junctions, passenger and goods traffic
8. New methods for railway vehicles monitoring, satellite monitoring system in railway traffic
9. Track recording cars for electric catenary system. Track recording cars for clearances.
10. Signaling systems and automatic train control system
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Klimeš, F.: Železniční stavitelství II. Praha, 1981. (CS)
Recommended reading
Classification of course in study plans
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
2. Set of reception sidings. Hump, technical equipment, sets of tracks design, longitudinal section of hump trak, dynamic estimation.
3. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
4. Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and trough passenger stations. Storage stations, technology, sets of tracks arrangement. Equipment of storage stations
5. Depots, running shed. Technology, arrangement of trackage. Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks.
6. Railway junctions, passenger and goods traffic. New methods for railway vehicles monitoring, satellite monitoring system in railway traffic
7. Track recording cars for electric catenary system. Track recording cars for clearances.
8. Signalling systems and automatic train control system
Exercise
Teacher / Lecturer
Syllabus
2. Design of hump height.
3. Design of turnout assembly, sets of tracks.
4. Design of longitudinal profile.
5. Dynamic evaluation of hump.
6. Format and content of drawings – setting out drawing, longitudinal profile.
7. Technical report. Consultation of project.
8. Submitting of the projects, credit.