Course detail
Technological projecting and logistic
FEKT-NTPLAcad. year: 2011/2012
Innovation of production process, new production. Stages of the project. Modelling of production systems. Project preparation of production, methodics of project solution and project planning. ERP (Enterprice Resource Planning), designs of processes, production diagrams, designs of equipment. Supply logistics, manipulation with material, logistic tools and technology. Projecting of preproduction and production, projecting of assembly, ALB (Assembly line balancing) method. Study of feasibility including economic evaluation.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
seminar project - max.20 b
examine - max. 70 b
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Sule, D., R.:Manufacturing Facilities, PWS Boston (EN)
Recommended reading
Classification of course in study plans
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
Design of production process innovation, design of new production.
Stages of the design, time schedule.
Modelling of production systems.
Project preparation of production, methodics of project solution and project planning. LOGFRAME
ERP (Enterprice Resource Planning)
Designs of processes, production diagrams, designs of equipment.
Supply logistics, manipulation with material.
Logistic tools and technology.
Projecting of preproduction and production. Projecting of assembly, ALB (Assembly line balancing) method.
Feasibility study including economic evaluation.
Fundamentals seminar
Teacher / Lecturer
Syllabus
Assignment of the project.
Project management.
ERP (Enterprice Resource Planning).
Supply logistics. Production logistics.
Manipulation with material.
Logistic tools and technology.
Pareto, FMEA(Failure Mode nad Effects Analysis).
ALB (Assembly line balancing) method.
Project solution. Feasibility study.Effectiveness of investments.