Přístupnostní navigace
E-application
Search Search Close
Publication detail
VLČKOVÁ, J. HENKOVÁ, S.
Original Title
Risk Planning in Connection with Public Procurement
Type
journal article - other
Language
English
Original Abstract
The article focuses on the option of creating a list of undesirable phenomena and a way of planning to deal with the risks related to a given planned construction. Price is usually the most important evaluation criterion in public procurement, therefore, our objective to show the necessity of the timely incorporation the costs of safety measures into bills of quantities. Hereby the same entry conditions are created for all applicants. An effort is made to provide a sufficient amount of arguments to aid in understanding the necessity of the timely production of an Occupation Health and Safety Plan for a construction site at the construction planning stage. The Plan includes safety measures which will affect the prices quoted for the project during the public procurement procedure, and also the length of the construction process.
Keywords
Risk plan, procurement, preparation of construction, plan for occupational safety and health, contractor, risk;
Authors
VLČKOVÁ, J.; HENKOVÁ, S.
Released
8. 11. 2016
Publisher
Editura Adoram
Location
Romania
ISBN
2344-2409
Periodical
International journal of interdisciplinarity in theory and practice
Year of study
2016
Number
11
State
Pages from
275
Pages to
280
Pages count
6
URL
http://www.itpb.eu/index.php/ct-menu-item-3/14-engineering/408-11-cislo-clanok-52
BibTex
@article{BUT132564, author="Jitka Laura {Vlčková} and Svatava {Henková}", title="Risk Planning in Connection with Public Procurement", journal="International journal of interdisciplinarity in theory and practice", year="2016", volume="2016", number="11", pages="275--280", issn="2344-2409", url="http://www.itpb.eu/index.php/ct-menu-item-3/14-engineering/408-11-cislo-clanok-52" }