Risk Planning in Connection with Public Procurement

VLČKOVÁ, J. HENKOVÁ, S.

Original Title

Risk Planning in Connection with Public Procurement

Type

journal article - other

Language

English

Original Abstract

The article focuses on the option of creating a list of undesirable phenomena and a way of planning to deal with the risks related to a given planned construction. Price is usually the most important evaluation criterion in public procurement, therefore, our objective to show the necessity of the timely incorporation the costs of safety measures into bills of quantities. Hereby the same entry conditions are created for all applicants. An effort is made to provide a sufficient amount of arguments to aid in understanding the necessity of the timely production of an Occupation Health and Safety Plan for a construction site at the construction planning stage. The Plan includes safety measures which will affect the prices quoted for the project during the public procurement procedure, and also the length of the construction process.

Keywords

Risk plan, procurement, preparation of construction, plan for occupational safety and health, contractor, risk;

Authors

VLČKOVÁ, J.; HENKOVÁ, S.

Released

8. 11. 2016

Publisher

Editura Adoram

Location

Romania

ISBN

2344-2409

Periodical

International journal of interdisciplinarity in theory and practice

Year of study

2016

Number

11

State

Romania

Pages from

275

Pages to

280

Pages count

6

URL

BibTex

@article{BUT132564,
  author="Jitka Laura {Vlčková} and Svatava {Henková}",
  title="Risk Planning in Connection with Public Procurement",
  journal="International journal of interdisciplinarity in theory and practice",
  year="2016",
  volume="2016",
  number="11",
  pages="275--280",
  issn="2344-2409",
  url="http://www.itpb.eu/index.php/ct-menu-item-3/14-engineering/408-11-cislo-clanok-52"
}