Přístupnostní navigace
E-application
Search Search Close
Publication result detail
ŠEDA, M.
Original Title
Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems
English Title
Type
Peer-reviewed article not indexed in WoS or Scopus
Original Abstract
This paper describes a new technique for solving the duration minimization in a resource-constrained network. It is based on a transformation of the resource-constrained project scheduling problem (RCPSP) to a sequence of (multi)knapsack problem (MKP) solutions. In the first part, three deterministic approaches are summarized and their time complexity is discussed. Due to the combinatorial nature of the problem for large projects with many constraints, heuristic techniques are applied. A genetic algorithm approach is proposed and compared with simulated annealing.
English abstract
Keywords
Resource-Constrained Project Scheduling Problem, Multi-Knapsack Problem
Key words in English
Authors
Released
01.07.2006
ISBN
1790-0832
Periodical
WSEAS Transactions on Information Science and Applications
Volume
3
Number
10
State
Hellenic Republic
Pages from
1785
Pages count
7
BibTex
@article{BUT43698, author="Miloš {Šeda}", title="Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems", journal="WSEAS Transactions on Information Science and Applications", year="2006", volume="3", number="10", pages="7", issn="1790-0832" }