Přístupnostní navigace
E-application
Search Search Close
Publication result detail
STRÁSKÝ, J., KULHAVÝ, T.
Original Title
The millennium bridge
English Title
Type
Peer-reviewed article not indexed in WoS or Scopus
Original Abstract
The bicycle and foot bridge is part of a larger project involving works for the enjoyment of the park along the Medway river at Maidstone, in the UK. It was financed by the Millennium Commission and enables access to a new part, the Whatman´s Field park, recently created in an area - earlier inaccessable - located between the river and a railway line. The two-span ribbon bridge deck, of original conception, is the first example of a bridge having an elbow centreline. In fact, the centrelines of the two spans meet at an angle in plan of 25°. The bridge overal length is 101.5 m, and the maximum clear length of the main span, over the riverbed, is 49.5 m; the approach-span clear length is 37.5 m.
English abstract
Keywords
foot and bicycle bridge, tensioned ribbon, precast concrete segments, static and dynamic analyses, construction procedure
Key words in English
Authors
Released
01.11.2003
Location
Řím
Book
L´industria italiana del Cemento
Edition
792
ISBN
0019-7637
Periodical
Volume
2003
Number
State
Republic of Italy
Pages from
860-872
Pages count
12