Project detail
Construction of Cooling Section, Modification of Testing Bench, Air Pump Measurements in Inert Atmosphere
Duration: 11.4.2014 — 16.12.2014
Funding resources
Neveřejný sektor - Přímé kontrakty - smluvní výzkum, neveřejné zdroje
On the project
The aim of the project was: Construction of Cooling Section, Modification of Testing Bench, Air Pump Measurements in Inert Atmosphere
Key words in English
Cooling Section; Modification of Testing Bench; Air Pump Measurements in Inert Atmosphere
Mark
HS13457101
Default language
Czech
People responsible
Raudenský Miroslav, prof. Ing., CSc. - principal person responsible
Units
Section of Heat Transfer and Fluid Flow Division
- responsible department (1.1.1989 - not assigned)
FIVES STEIN
- client (1.1.1900 - not assigned)
Section of Heat Transfer and Fluid Flow Division
- beneficiary (11.4.2014 - 16.12.2014)
Results
HORSKÝ, J.; CHABIČOVSKÝ, M.; HNÍZDIL, M.; STRÁNSKÝ, M.; KOTRBÁČEK, P. Chlazení trubek – první testy. 2014. p. 1-32.
Detail
Responsibility: Raudenský Miroslav, prof. Ing., CSc.