Course detail
Railway Stations and Junctions 2
FAST-NNB016Acad. year: 2025/2026
Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and through passenger stations.
Storage stations, technology, sets of tracks arrangement. Equipment of storage stations
Shunting yards, functions, position in railway network. Development of sorting technology. Set of reception sidings. Hump, technical equipment, sets of tracks design, longitudinal section of hump track, dynamic estimation. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
Depots, running shed. Technology, the arrangement of trackage.
Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks
Railway junctions, passenger and goods traffic.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Entry knowledge
Rules for evaluation and completion of the course
Aims
A student acquires skills in problems of railway junctions, passenger and goods traffic.
Study aids
Prerequisites and corequisites
Basic literature
Gombitová, J., Projektovanie, stavba a rekonštrukcia železničných staníc I, EDIS, 2007, ISBN 978-80-8070-755-2 (SK)
Recommended reading
Classification of course in study plans
- Programme NPC-SIK Master's 2 year of study, winter semester, compulsory-optional
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
- 1. Shunting yards, functions, position in railway network. Development of sorting technology.
- 2. Set of reception sidings. Set of sorting sidings. Set of departure sidings, tracks for thoroughgoing trains.
- 3. Hump, technical equipment.Sets of tracks design, longitudinal section of hump track, dynamic estimation.
- 4. Passenger stations, types, technology, extent. Switch and track layout, equipment and efficiency. Railhead and through passenger stations.
- 5. Storage stations, technology, sets of tracks arrangement. Equipment of storage stations.
- 6. Depots, running shed. Technology, the arrangement of trackage.
- 7.–8. Railway siding (factory, industrial), set of tracks, connection to railway stations, interchange tracks.
- 9.–10. Railway junctions, passenger and goods traffic.
Exercise
Teacher / Lecturer
Syllabus
- 1. Specifying of the project, guidelines to draw up.
- 2. Design of hump height.
- 3. Design of turnout assembly, sets of tracks.
- 4. Design of longitudinal profile.
- 5. Dynamic evaluation of hump.
- 6. Format and content of drawings – Setting out drawing, longitudinal profile.
- 7. Consultation on the project.
- 8. Submitting of the projects, credit.