Projects worked on
Determination of technical value in an atypical case - destruction by fire
Mark: C1390Project duration: 15.9.2011 - 31.1.2012
Research report for the project DAR of company Škoda auto, a.s. on topic Driving in a convoy of vehicles, the impact of assistance systems to change driver behavior
Mark: DARProject duration: 9.9.2011 - 7.2.2012
Methodology for determining the cost of removal of hidden defects for residential buildings
Mark: C1426Project duration: 2.8.2011 - 7.12.2012
Valuation methodology farm buildings in the Klučově for the restitution proceedings
Mark: C1416Project duration: 10.5.2011 - 25.9.2012
Methodology for measuring of lateral movement of motorcycle and determination methodology for documentation of vehicle damage for acquisition Energy Equivalent Speed (EES).
Mark: ÚSI-J-11-2Project duration: 1.4.2011 - 31.12.2011
Creation of Valuation standard no. X
Mark: ZSXProject duration: 9.3.2011 - 10.1.2012
Method for the determination the normal level of profit in the field of construction of structures
Mark: C1431Project duration: 28.2.2011 - 15.12.2012
Methodology for Gathering and Data Processing for Real Estate Valuation
Mark: ÚSI-J-11-1Project duration: 1.1.2011 - 31.12.2011
Long-range exchange of elements of life in the area paper mills
Mark: C1420Project duration: 30.12.2010 - 31.10.2012
Modernizace výuky magisterského studijního programu Soudní inženýrství na Vysokém učení technickém v Brně
Mark: CZ.1.07/2.2.00/15.0151Project duration: 1.10.2010 - 30.9.2013
Development of methodics of Forensic Engineering
Mark: ÚSI-J-10-1Project duration: 25.2.2010 - 31.12.2010
Sharing experiences and good practices in the analysis and prevention of road traffic accidents
Mark: CZ0069Project duration: 15.2.2010 - 30.5.2011
Development of research activities at Institute of Forensic Engineering
Mark: RTAUSIProject duration: 1.1.2010 - 31.12.2012
Critical Analysis of Public Administration Expertise
Mark: KAVSZProject duration: 1.1.2009 - 12.10.2025
Showing results 106 - 120 of 128 results.
Responsibility: Ing. Michal Urbánek