Přístupnostní navigace
E-application
Search Search Close
Publication result detail
PAŘÍLKOVÁ, J.; ZACHOVAL, Z.; PAŘÍLEK, L.; FEJFAROVÁ, M.; GARDAVSKÁ, Z.; NOVÁK, M.
Original Title
MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE
English Title
Type
Paper in proceedings (conference paper)
Original Abstract
For the needs of the Czech Anglers Union seated in the municipality of Jevíčko, a pond has been built. Points were determined on the pond dam, where the relationship between soil moisture and the height of the water level in the pond was monitored by the indirect method of electrical impedance spectrometry. The monitoring was started on September 2008 and is continuously realized. Even after several repairs of the earth-fill dike of the Bezednik reservoir near the municipality of Kobeřice, also this hydraulic structure is monitored. The monitoring was started on June 2006 and the works are realized into this time. Some of obtained results from this year are included in the submitted paper.
English abstract
Keywords
soil, moisture, water level, pond, electrical impedance spectrometry
Key words in English
Authors
RIV year
2012
Released
10.11.2011
Publisher
VUTIUM
Location
Brno
ISBN
978-80-214-4325-9
Book
EUREKA 2011
Edition
neuv
Pages from
114
Pages to
127
Pages count
14
BibTex
@inproceedings{BUT88751, author="Jana {Pařílková} and Zbyněk {Zachoval} and Luboš {Pařílek} and Marie {Fejfarová} and Zuzana {Gardavská} and Michael {Novák}", title="MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE", booktitle="EUREKA 2011", year="2011", series="neuv", number="1", pages="114--127", publisher="VUTIUM", address="Brno", isbn="978-80-214-4325-9" }